Immersive BIM Coordination for Pre-Construction

604.854.0468

About Forefront

Built to Eliminate Avoidable Construction Risk

Forefront was created with a single objective:

Identify coordination risk before it reaches the job site.

In modern construction, delays rarely begin in the field.
They begin in coordination — in the gap between design intent and spatial reality.

Forefront bridges that gap.

By bringing BIM models into full-scale immersive VR, we allow project teams to experience the build before construction begins — exposing trade conflicts, clearance issues, slope errors, and constructability risks early, when they are faster and more cost-effective to resolve.

This is not visualization.
It is structured pre-construction risk reduction.

Andrew Atkinson (FOUNDER)

Constructing Excellence, One Project at a Time