Immersive BIM Coordination for Pre-Construction

604.854.0468

Why Forefront

Coordination Clarity Protects Capital.

In construction, risk compounds quickly.
A small coordination oversight can become schedule drift, change orders, rework, and margin loss.

Forefront exists to surface that risk early — when resolution is fastest and least expensive.

This is not visualization.
It is structured pre-construction risk reduction.

Why Immersive Review Wins

The Problem With Traditional Review

he intake phase is structured and deliberate.

Teams systematically evaluate:

• Model organization and trade separation
• Geometry optimization for standalone VR performance
• System structuring for isolated coordination review
• Spatial integrity prior to immersive deployment

This step ensures the model is prepared for immersive coordination — not simply visualization.

Precision here ensures clarity during the review phase.

What Forefront Changes

The prepared model is deployed into a full-scale VR coordination environment.

Using standalone hardware (Meta Quest 3), teams can:

  • Walk the building at true scale

  • Isolate trade systems independently

  • Inspect high-risk coordination zones

  • Evaluate spatial relationships dynamically

No workstations.
No complex setup.
Just controlled immersion.

Built for Pre-Construction Teams

The review phase is intentional and focused.

Teams systematically evaluate:

  • Trade-to-trade conflicts

  • Clearance and maintenance zones

  • Pipe slopes and alignment

  • Constructability risks

  • Spatial inefficiencies

Issues that may remain hidden in traditional screen reviews become immediately visible at full scale.

Risk is identified early — when resolution is fastest and least expensive.

True-Scale Conflict Detection

Findings are documented and delivered back to the coordination team with clarity.

This phase:

  • Supports informed decision-making

  • Strengthens BIM refinement cycles

  • Reduces downstream RFIs

  • Protects schedule certainty

Forefront does not disrupt your workflow.
It enhances it.

Designed for Real-World Pre-Construction

Forefront is designed for:

  • Project Developers

  • Pre-Construction Managers

  • Commercial & Multi-Unit Builders

  • BIM and coordination teams

If you’re responsible for schedule, budget, or risk — Forefront is built for you.

If You Want More Control Before Construction Begins — Choose Forefront.